Berkeley County
- Replacing the Mill Creek
overpass bridge along I-81 – awarded to Orders Construction Company,
St. Albans, WV, $4,536,993.30
- Resurfacing 2.9 miles of
US 11, Bunker Hill to the Virginia State Line – awarded to Jefferson
Asphalt Products Co., Inc., Charles Town, WV, $668,549.25
- Resurfacing 2.6 miles of
WV 51, Gerrardstown to Inwood – awarded to Jefferson Asphalt
Products Co., Inc, Charles Town, WV, $733,547.80
Braxton County
- Construct shoulders,
guardrail, drainage and resurface 2.83 miles of WV 4, Elk River
Road, from Clay County line to County 40 – awarded to Meadows Stone
& Paving, Inc., Gassaway, WV, $715,426.77
Brooke County
- Replacing Long Run Bridge
along County 32/3 – awarded to Bear Contracting, Clarksburg, WV,
$998,640.09
Cabell County
- Widen to 6 lanes and
replace bridges along 3.51 miles of I-64 from 29th Street (exit 15)
to Gyandotte River bridge (General
Obligation Bond project) – awarded to Triton
Construction Inc., St. Albans, WV, $91,850,000.00
- Resurfacing .74 miles
along County 17, Blue Sulphur – awarded to West Virginia Paving,
Inc., Dunbar, WV, $97,883.40
- Correct 3 slides, with
piling walls, along WV 10 at Salt Rock Road – awarded to Marks
Drilling, Walton, WV, $438,134.37
Calhoun County
- Slide correction, with
piling wall, along WV 16, Chloe Road, in Arnoldsburg – awarded to
Marks Drilling, Walton, WV, $164,239.68
Fayette County
- Widening, provide
drainage, and resurfacing .39 miles along County 38/7, Halstead
Street (ROADS
TO PROSPERITY PROJECT) – awarded to Landcore
Builders, LLC, DBA Scott Wheeler Development, Milton, WV,
$1,370,578.54
Grant County
- Resurfacing 1.00 mile
along Main Street, WV 28, in Petersburg – awarded to West Virginia
Paving, Inc., Dunbar, WV, $445,361.65
Greenbrier
County
- Resurfacing 2.33 miles
along WV 20, Rainelle Road, from Fayette County line to US 60 –
awarded to West Virginia Paving, Inc., Dunbar, WV, $850,339.85
Hardy County
- Resurfacing 1.98 miles
along WV 55 from Sinks Bridge to Wardensville – awarded to Belt Paving,
Inc., Cumberland, MD, $1,504,878.00
- Resurfacing 4.96 miles
along WV 55 from Luxemburg Road to Baker interchange – awarded to
Belt Paving, Inc, Cumberland, MD, $3,979,853.70
Jefferson County
- Resurfacing 1.40 miles
along WV 230, Shepherdstown Pike – awarded to Jefferson Asphalt
Products Co., Inc., Charles Town, WV, $298,864.50
Lewis County
- Shoulder, drainage,
guardrail and resurfacing of 4.60 miles along US 33, Weston Road
toward Glenville – awarded to Wolfe’s Excavating, LLC, Clarksburg,
WV $931,530.27
Lincoln County
- Resurfacing of 1.49 miles
along WV 34 between Hamlin and Bowles – awarded to West Virginia
Paving, Inc., Dunbar, WV, $263,655.10
- Slide correction along WV
3, Beech Grove Road – awarded to Alan Stone Co., Inc., Williamstown,
WV, $93,921.40
McDowell County
- Replacing Newhall Bridge
along WV 16 – awarded to Jim Construction, Inc., Charleston, WV,
$622,044.39
Marshall County
- Slide Correction along US
250 at milepost 17.24 – awarded to Ohio-West Virginia Excavating
Co., Shadyside, OH, $111,240.08
Mercer County
- Replacing the Brick
Street Bridge along WV 104 – awarded to Orders Construction Company,
Inc., St. Albans, WV, $2,148,121.70
Mineral County
- Resurfacing 3.00 miles
along WV 28 between WV 956 (Short Gap) and Scenic Lane – awarded to
Belt Paving, Inc., Cumberland, MD, $953,215.90
Mingo County
- Replacing the Jacob and
Ellen Vance Memorial Bridge along County 3/5 (ROADS TO PROSPERITY
PROJECT) – awarded to Triton Construction, St.
Albans, WV, $1,439,732.12
- Replacing Breeden Tunnel
Bridge along County 3/5 (ROADS
TO PROSPERITY PROJECT) – awarded to Bush
& Burchett, Inc., Prestonsburg, KY, $1,476,487.83
- Resurfacing .74 miles
along WV 65 between Delbarton and Elk Creek – awarded to West
Virginia Paving, Inc., Dunbar, WV, $348,225.83
Monroe County
- Resurfacing 2.00 miles
along WV 3 from US 219 to Keenan Road – awarded to West Virginia
Paving, Inc., Dunbar, WV, $598,080.88
Morgan County
- Bath Streetscape Phase IV
design (Berkeley Springs) – still outstanding
Nicholas County
- Resurfacing 3.98 miles
along WV 20 between Green Valley and Leivasy – awarded to West
Virginia Paving, Inc., St. Albans, WV, $1,050,496.06
- Installation of traffic
signal along US 19 at West Webster Road – awarded to Specialty
Groups, Inc., Bridgeport, WV, $249,011.50
Pendleton County
- Install High Friction
Surface Treatment (HFST) in 4 areas along US 33 – awarded to Titan
Industrial Services, Inc. Baltimore, MD, $511,297.50
- Resurfacing 2.82 miles
along US 220 in Franklin – awarded to West Virginia Paving, Inc.,
Dunbar, WV, $495,966.80
Pocahontas
County
- Slide Correction at WV
28, Boyer Hill Road – awarded to Marks Drilling, Walton, WV,
$174,029.12
Preston County
- Repair Kinsinger Run
Bridge along County 51 – awarded to Jim Construction, Inc.,
Charleston, WV, $269,209.69
Raleigh County
- Resurfacing of 4.87 miles
along I-64 between Bragg and Sandstone Road – awarded to Mountaineer
Contracting, Kingwood, WV, $3,087,499.65
Ritchie County
- Slide Correction along WV
16, Mahone Road – awarded to Marks Drilling, Walton, WV, $158,652.59
Roane County
- Slide Correction along WV
36, Clay Road – awarded to Marks Drilling, Walton, WV, $161,397.10
Tucker County
- Resurfacing of 2.9 miles
along US 219 between Mackeyville and Tucker County High School –
awarded to West Virginia Paving, Inc., Dunbar, WV, $662,016.47
- Slide Correction along
County 1, Holly Meadows Extension – awarded to BBR Drilling Company,
Inc, Belmont, OH, $243,605.80
Wayne County
- Resurfacing 2.29 miles
along WV 37 to East Lynn to boat ramp entrance of lake – awarded to
West Virginia Paving, Inc., Dunbar, WV, $641,249.80
- Resurfacing 1.01 miles
along WV 152, Moses Fork Mountain – awarded to Bear Contracting,
LLC, Clarksburg, WV, $379,840.15
|
|
|